Texas Instruments TPS7H3014EVM-CVAL Evaluation Module
Texas Instruments TPS7H3014EVM-CVAL Evaluation Module is designed to quickly and easily demonstrate the operation of a single TPS7H3014-SP sequencer. The TI TPS7H3014EVM-CVAL board provides footprints that can be populated with additional components. These components allow for the testing of customized configurations, such as daisy-chained sequencers.Features
- Flexible configuration options, including single-device and daisy-chained device circuits
- Footprints for the optional external system reset signal
- Customizable delay timers, sense thresholds, sense hysteresis, and sequence up and down thresholds
Layout
Publicado: 2024-04-26
| Actualizado: 2024-05-09
