Texas Instruments TPS1641EVM Evaluation Module

Texas Instruments TPS1641EVM Evaluation Module demonstrates the reference circuit evaluation of TPS1641x. The TPS1641x is a compact 40V, 1.8A eFuse. The TI TPS1641x device features overcurrent protection with an adjustable blanking timer, output power limiting with an adjustable blanking timer, short-circuit protection, overvoltage protection, IN to OUT short detection, and overtemperature protection.

Features

  • 2.7V to 40V input operating range
  • 30mA to 1.8A programmable current limit
  • 4W to 38W programmable power limit
  • Configurable blanking time for transient currents
  • LED status indication for faults

Applications

  • Low power circuit for appliances
  • Back-plane power protection in PLC and DCS modules
  • HVAC actuators and valve control
  • Medical equipment

Layout

Texas Instruments TPS1641EVM Evaluation Module

Setup with Test Equipment

Texas Instruments TPS1641EVM Evaluation Module
Publicado: 2023-01-23 | Actualizado: 2023-02-28