The TMS320F280049C microcontroller-based board implements the TI DRV8376's hardware and has reference software that transmits essential signals to the DRV8376 to spin a 3-phase brushless-DC motor.
The GUIComposer software enables users to program settings, allow the motor to spin, and monitor the system for fault conditions.
Features
- 4.5V to 65V operating voltage (70V abs max)
- 4.5A peak high output current capability
- AVDD and GVDD regulators
- Supply and fault LEDs
- Integrated CSAs for three-phase low-side current measurement
- C2000 (LAUNCHXL-F280049C) sensored trapezoidal firmware available
Applications
- Brushless-DC (BLDC) motor modules
- HVAC motors
- Office automation machines
- Factory automation and robotics
- Wireless antenna motor
- ATMs (Automated Teller Machines)
- Drones
Kit Contents
- DRV8376EVM
- EVM Disclaimer Read Me
Layout
Simplified Schematic
Major Hardware Blocks
DRV8376EVM LaunchXL-F280049C Connection
LED Indicators
Publicado: 2025-05-23
| Actualizado: 2025-06-03

